Westgroup employee housing
18 units in 2 Westleys and 8 Ridgelines, with a 6-unit stack in progress. In Teton Valley, just south of Driggs.

You can't hire people who can't find a place to live. We build the housing that gets your team here.
Modular employee housing starts with a simple problem: in mountain resort towns, the jobs are in town and the homes are not. Nearly 75% of Big Sky's workforce commutes in (KXLF, 2026). In Jackson, 66% of Lower Valley Energy staff and 58% of the Sheriff's Office commute in (Buckrail, 2023). In Idaho's Wood River Valley, rental vacancy is near zero (Boise State IPI and IHFA, 2025).
So employers and housing trusts build their own. Big Sky Resort passed 1,011 employee beds (Bozeman Daily Chronicle, 2024). Ketchum has built 111 homes toward a goal of 660 (KMVT, 2026). The need is bigger than the usual way of building can keep up with.
Building it is the hard part. Good trades are busy, expensive or hard to find: in a 2025 national survey, 88% of contractors had craft jobs that were hard to fill, and 45% had projects delayed by the shortage (AGC and NCCER, 2025). Building seasons are short, many sites are remote, and housing that isn't ready for the season doesn't help this season's crew.

Your units are built indoors while your local contractor gets the site ready, so the factory and the site move forward at the same time. Our factory builds through winter, so your units can be ready when the ground thaws. That matters for seasonal staff housing, where the season sets the deadline.
Every home is about 95% finished on our factory floor. The other 5% happens on your site. Our own crew sets your units, and you provide the crane.
Others in the region already build this way. Lone Mountain Land Co. chose modular for employee housing in Big Sky partly to move winter work indoors (Explore Big Sky). Wyoming Game and Fish built modular homes for its staff in Jackson through the winter, in a factory (KUNC, 2024).
Factory-built doesn't mean temporary. Our homes are built to the same building codes as site-built homes (IRC and IBC) and set on a permanent foundation: a crawlspace or a basement.
We don't sell modular as cheaper. Savings depend on design repetition. The real gain is time: your units are built while your site is prepared. Your lender usually works directly with you, and we're happy to talk with your bank if they need anything from us.

Beds before the season opens. Unit counts, phasing and a schedule you can take to your board.
Pick a plan and tell us about the site. We size the project and phase it with you.
Your units are built in our Idaho Falls factory, about 95% complete before they leave.
You handle site prep, the foundation (a crawlspace with at least 30 inches of clearance, or a basement) and utility hookups.
Our crew sets it on your foundation. You provide the crane.

18 units in 2 Westleys and 8 Ridgelines, with a 6-unit stack in progress. In Teton Valley, just south of Driggs.

8 Ridgelines and 8 garages in the Sun Valley area.
At Westgroup employee housing in Victor, Idaho, we built in phases: 4 Ridgelines, then 2 Westleys, then 4 more Ridgelines. That's 18 units and 30 bedrooms finished. Phase 4 is in progress: 2 three-bed Ridgelines stacked on top of 2 two-unit Dakotas, for 24 units and 44 bedrooms in all.
Sun Valley firefighter housing is 8 two-bedroom Ridgelines and 8 garages.
Start with one building or plan several phases. We offer volume pricing on multi-unit projects. Your lender usually works directly with you, and we're happy to talk with your bank if they need anything from us.
“They completed the homes ahead of schedule – which is REALLY uncommon in the construction industry.”


From 341sq ft per unit
1 or 2 bed · 1 to 2 bath · 2 or 3 units in one building · 1 story
Multifamily only. Two or three units in one.
Bedrooms per building: 3 (3-unit version) or 4 (2-unit version)
View plans + options
5units
1 to 2 bed · 1 bath · 5 units in one building (2,772 sq ft) · 2 stories
Can be stacked when a project needs more height; stacked configurations are confirmed in engineering.
Three 1 bed, 1 bath units (about 420 sq ft) and two 2 bed, 1 bath units (about 756 sq ft). 7 bedrooms.
Bedrooms per building: 7
View plans + optionsThe Ridgeline is 840 sq ft, 2 bed and 2 bath on one story, and it stacks. The Westley puts 5 units in one 2,772 sq ft building: three 1 bed and two 2 bed. The Dakota is multifamily only, with two or three units in one building.
Every project is engineered for its location, including snow loads, wind and seismic requirements. Plans can be adjusted, as long as each module still fits on a truck.
Charging rent? The revenue calculator works with a monthly rent too.
Anything from a single home to multi-phase projects. Westgroup is 24 units across four phases.
A crawlspace or a basement. Either way, there needs to be access to the utilities underneath.
You do. Our crew sets the modules, and your crane does the heavy lifting.
Your lender usually works directly with you, and we're happy to talk with your bank if they need anything from us.
In the factory, state-certified or approved third-party inspectors check the work. On site, your local building inspectors handle it, and we coordinate with your building official.
We don't offer general contracting at this time. Give us a call and we'll talk through your project.
Building homes to rent as well? See modular multifamily, or short-term rentals for guest units. More answers are in our FAQ.